Roofs and the generator
Power continuity and roof protection need coordinated planning at a hospital. Milton's widespread Pinellas outages show why equipment spaces and their access arrangements belong in the preparation schedule. During that time the building must stay dry. A roof leak over an electrical room or a generator switchgear area is the worst combination.
Tropicana Field in St. Petersburg shows how long a large roof repair can take. Milton damaged its roof in October 2024, repairs began in July 2025 and finished in April 2026. Build lead time into any large project, and begin early.
Before the season, we clear drains, check the edge metal and photograph every roof. After a storm, we dry in first and assess second, using the storm damage roof repair process. Health systems with clinics and offices can add the medical office roof to the same calendar, and a healthcare system roof program keeps every building on one plan.
Commercial Roofing Questions
Why do hospital roofs leak at the joints between buildings?
Movement. Two buildings shift at different rates with heat, wind and settling, and a rigid seal tears. Expansion joints need covers that flex and flashing that turns up the wall without stretching. We inspect each joint, test the seal and rebuild it with materials that allow movement.
How do you handle infection control during roof work?
We follow your facility's rules. That means containment at the work area, dust control, protected air intakes and a written plan reviewed by your infection-control and safety teams. Roof penetrations over care areas are sealed the same day they are opened, and cleanup is part of each shift.
Can a hospital roof program run across several budget years?
Yes, and it often should. Roofs are ranked by risk, the worst go first and each finished roof stays on a maintenance schedule. A written plan with dates and ranges gives finance a number to carry, and facilities a path to follow.
How long can a large roof repair take after a major storm?
The scope and access determine the duration. Tropicana Field's documented repair schedule after Milton shows that a specialized roof project can extend well beyond the first protection work. We establish the hospital's temporary measures and permanent scope separately, including material lead times, permits and care-area coordination.
What should be checked before hurricane season starts?
Edges, drains and equipment tie-downs, in that order. Perimeter metal and fasteners decide whether wind can start a peel, and clear drains keep rain off the roof. We photograph everything before the season so damage is easy to spot afterward.